Execution Track Record

Representative Projects & Experience

Representative airfield engineering models showcasing technical methodologies, airside civil-electrical coordination, regulatory handovers, and lifecycle maintenance outcomes.

Osubi Airstrip CatII Runway Lighting
Osubi layout
CatI/CatII Layout 05-23 runway

Cat I/Cat II runway 05-23 layout featuring precision approach lighting, runway edge lights, centreline guidance, and associated electrical infrastructure designed to support safe aircraft operations in low-visibility conditions.

PAPI
CatII Threshold: Inset seating pots install

Installation of inset seating pots at the Cat II runway threshold, ensuring precise positioning, secure mounting, and proper integration for inset approach lighting fixtures and reliable low-visibility operations.

CCR
Osubi at Commissioning 2001

Osubi airstrip commissioning in 2001 marked a significant milestone in our airfield ground lighting experience, demonstrating our involvement in delivering essential aviation infrastructure for safe aircraft operations.




Ogunu IA Heliport: Aircraft Radio-Controlled Airfield Lighting (ARCAL)
Beacon
Inset core operation at Ogunu IA Heliport

Inset core drilling at Ogunu IA Heliport to create precise recesses for flush-mounted airfield lighting fixtures, ensuring accurate positioning, secure installation, and reliable performance under helicopter operations.

Osubi commissioning
Power and Control board

The power and control board integrates protective devices, switching components, terminal connections, and control circuits to distribute electrical power safely and reliably throughout the airfield lighting system.

Beacon
Wireway slotting on the heliport runway

Wireway slotting along the heliport pavement creates dedicated channels for electrical cabling, ensuring protected cable routing, precise installation, and reliable connections for the airfield lighting system.


PHC IA HELIPORT UPS BACKED LIGHTING
Helipad
Visual Beacon mounted at high level

High-level visual beacon installation providing clear, elevated visual guidance for pilots during approach and landing, enhancing airfield visibility, situational awareness, and operational safety in varying conditions.

PHCIA
Wire-way slotting at the apron

Precision slotting of the apron pavement to accommodate wire-way installations, providing protected routing for airfield lighting cables and ensuring reliable electrical connections, maintainability, and long-term operational performance.

Inset coring at the aiming point

Precision coring at the runway aiming point to create accurately positioned recesses for inset airfield lighting fixtures, ensuring secure installation, correct alignment, and reliable performance under aircraft operations.

FORCADOS HELIPAD TLOF + FLOODLIGHTING
Helipad
Base chamber placements

Accurate placement of base chambers around the helipad provides accessible junction points for lighting cables, facilitating secure connections, efficient maintenance, and reliable operation of the lighting system.

Forcados civil
Helipad Floodlighting and TLOF

Installation of helipad floodlighting and Touchdown and Lift-Off Area (TLOF) lighting to provide clear visual guidance, enhance surface visibility, and support safe helicopter operations at night.

Forcados civil
Lit to demonstrate the floodlighting

Night-time demonstration of the installed helipad floodlighting system, showcasing effective illumination across the landing area to improve surface visibility, pilot guidance, and helicopter operational safety.

NAF Base port harcourt airstrip runway lighting
Helipad
Sighting threshold level

Surveying the runway threshold level to verify elevation, alignment, and sighting accuracy, ensuring compliance with design specifications and supporting safe aircraft approach, landing, and airfield lighting installation.

PAPI
PAPI unit calibration

PAPI unit calibration ensures accurate visual glide-path guidance by adjusting light angles and verifying red-white indications, supporting correct approach alignment and safer aircraft landings under varying visibility conditions.

Wing bar
Threshold elevated wing bar

Installation of the elevated threshold wing bar provides prominent visual guidance for approaching pilots, ensuring clear runway threshold identification, accurate alignment, and improved operational safety during aircraft approaches.

Asaba Airport runway lighting complete rehabilitation
Helipad
Primary series circuit cable revision

Primary series circuit cable revision involves inspecting and verifying cable continuity, insulation integrity, and connections to ensure reliable current flow and safe operation of the airfield lighting system.

PAPI
Complete PAPI wing

Completed PAPI wing installation, with precision-aligned approach light units providing accurate visual glide-path guidance, helping pilots maintain the correct descent angle for safe runway approaches and landings.

Field and Control circuits revision

Revision of field and control circuits to verify wiring integrity, correct connections, reliable switching, and coordinated operation, ensuring dependable performance of the airfield ground lighting system.

osubi + ogunu maintenance contract
Helipad
Floodlighting and Windcone control checks

Routine checks of floodlighting and windcone controls verify switching, illumination, and wind-direction indication, ensuring reliable operation, adequate heliport visibility, and safe helicopter movements during night-time operations.

Windsock periodic checks

Periodic windsock inspections verify fabric condition, free rotation, mounting integrity, and visibility, ensuring accurate wind-direction indication for pilots and supporting safe aircraft approach, landing, and ground operations.

Periodic checks on the remote desk operation

Periodic checks of the remote control desk verify switching functions, circuit indications, and communication with field equipment, ensuring reliable monitoring, effective lighting control, and uninterrupted airfield operations.

Have a Similar Airfield Infrastructure Requirement?

Our engineering team can prepare a preliminary technical assessment and bill of quantities for your aerodrome project.